About Energy Compute Campus
The Flagship Implementation of the GridCore Model.
Energy Compute Campus is GridSite's flagship implementation of the GridCore campus model: a 500-acre integrated energy and compute campus designed for phased capacity delivery, high-density workloads, and long-term GridColo-standard operations.
Not the Model. The Implementation.
Where GridCore and GridColo Come Together.
Energy Compute Campus is not the generic model. It is the flagship implementation of a broader model: built with GridCore, operated through the GridColo service framework, and structured to demonstrate how energy and compute infrastructure can be planned as one governed campus system.
GridCore is the repeatable campus framework. GridColo is the customer-facing service model. Powered by GridColo is the operating affiliation and licensing framework. Energy Compute Campus is the flagship site where those concepts come together.
Built with GridCore
ECC is built with GridCore — the repeatable framework for planning, developing, and governing megawatt-scale data center campuses.
GridColo-Standard Service Environment
Customer-facing services at ECC — colocation, powered land, powered shell, connectivity, and operations — are delivered under the GridColo service model.
Self-Generation Primary Campus Strategy
ECC is a self-generation primary / islanded campus with future grid optionality — one of multiple deployment architectures the GridCore framework supports.
Phased 100 MW Capacity Release
Capacity is released in structured 100 MW blocks, beginning Q1 2027, with subsequent blocks approximately every 8 months.
Safety and Operations Designed In
Safety, security, and operating authority are embedded from development — not added after construction.
Diligence-Ready Documentation
Program maturity with evidence, records, and governance to support tenant, lender, insurer, and regulatory review.
Who We Are
We Build the Whole System.
Energy Compute Campus is GridSite's flagship implementation of the GridCore campus model — a 500-acre integrated energy and compute campus designed for phased capacity delivery, high-density workloads, and long-term GridColo-standard operations.
The campus is built with GridCore, which coordinates land, power, buildings, cooling, connectivity, safety, security, and operations as one governed campus system. Services are delivered through the GridColo service model, covering turnkey colocation, powered land, powered shell, connectivity, and tenant-facing workflows.
We develop for the long term. We operate what we build. And we are accountable for the performance of the whole system — not just our slice of it.
Campus Scale
Gigawatt+ total capacity
Delivered through a phased buildout
Site Footprint
500 Acres
Master-planned integrated campus
Operating Model
Integrated & Long-Term
We operate what we build — indefinitely
Design Principle
Systems First
No gaps between energy, compute, safety, and ops
What Makes ECC Different
Four Differentiators That Matter to Operators and Investors.
Genuine integration, not co-location
Energy and compute operations are governed by a single operating framework — not separate teams with a coordination interface bolted between them.
Safety as a design discipline
Permit-to-work, LOTO, emergency response, and EHS governance are designed into campus architecture from day one — not applied after construction.
Built for high-load digital workloads
Campus infrastructure is engineered specifically for the power density, cooling demands, and operational patterns of AI, HPC, and hyperscale compute.
Long-term operational accountability
We do not build and exit. Our governance structure and operational discipline are designed for decades of reliable operation.
Operating Principles
How We Think About Our Work.
Rigor over rhetoric
We document, test, and evidence our programs. We do not accept assurances — of safety, of reliability, or of readiness — without evidence.
Operational authority is earned
The right to operate complex infrastructure is not conferred by a certificate. It is earned through demonstrated competence, maintained through discipline, and verified through records.
Long-term accountability
We make commitments we intend to keep for decades. Our governance, staffing, and financial structure are designed to support that.
Community is not optional
Responsible development of large-scale infrastructure requires genuine engagement with the communities it affects. That is a core obligation, not a strategic option.
Ready to reserve capacity?
Reservations for Phase 1 capacity are open now. First energization is scheduled for Q1 2027.